Installed power

SK

Allocation rules of available connection capacity to the power system for electricity sources and especially for local electricity sources between the transmission system operator and distribution system operators (Chapter 1.4. of document N).

Total available power for ES SR
1,837.0 MW
577.0 MW
-        
493.0 MW
-        
-        
478.0 MW
357.0 MW
-        
587.0 MW
91.0 MW
-        
279.0 MW
129.0 MW
-        
Total available power for ES SR
945.8 MW
576.3 MW
369.4 MW
14.7 MW
-        
14.7 MW
475.4 MW
356.5 MW
118.9 MW
306.3 MW
90.9 MW
215.4 MW
149.4 MW
129.0 MW
20.4 MW
Total available power for ES SR
891.2 MW
0.7 MW
-        
478.3 MW
-        
-        
2.6 MW
0.5 MW
-        
280.7 MW
0.1 MW
-        
129.6 MW
0.0 MW
-        

Date of last update: 20.3.2023 15:00

Total installed power in global impact point of view
Installed power of photovoltaic and wind electricity sources
Installed power of other electricity sources

Total depleted power = depleted power (photovoltaic and wind electricity sources + other electricity sources) above 11 kW

Any difference in totals may be due to rounding.

Register of depleted power for electricity sources type “Local electricity sources” with the subsidy right allocated by MH SR (Slovak Ministry of Economy) according to Act no. 309/2009 Coll. (in accordance with the Notice of the Ministry of Economy of the Slovak Republic for 2022 and 2023)

Power distribution system
(PDS)
Year Allocated power
(MW)
Depleted power (MW) Available power
(MW)
ZSD 2022 80.0 69.3 10.7
2023 80.0 52.1 27.9
SSD 2022 79.0 78.3 0.7
2023 90.0 66.4 23.6
VSD 2022 60.0 41.7 18.3
2023 30.0 26.0 4.0
PDS other like RDS
(Regional Distribution System)
2022 20.0 20*) 0*)

*) In terms of Slovak Ministry of Economy information (link)