Installed power

SK

Allocation rules of available connection capacity to the power system for electricity sources and especially for local electricity sources between the transmission system operator and distribution system operators (Chapter 1.4. of document N).

Total available power for ES SR
2,600.0 MW
747.0 MW
-        
1,000.0 MW
3.0 MW
-        
686.0 MW
376.0 MW
-        
600.0 MW
149.0 MW
-        
314.0 MW
210.0 MW
-        
Total available power for ES SR
948.7 MW
699.5 MW
249.2 MW
15.8 MW
1.1 MW
14.7 MW
429.1 MW
342.9 MW
86.2 MW
257.9 MW
146.0 MW
111.9 MW
245.9 MW
209.5 MW
36.4 MW
Total available power for ES SR
1,651.3 MW
47.5 MW
-        
984.2 MW
1.9 MW
-        
256.9 MW
33.1 MW
-        
342.1 MW
3.0 MW
-        
68.1 MW
0.5 MW
-        

Date of last update: 28.10.2024 15:04

Total installed power in global impact point of view
Installed power of photovoltaic and wind electricity sources
Installed power of other electricity sources

Total depleted power = depleted power (photovoltaic and wind electricity sources + other electricity sources) above 11 kW

Any difference in totals may be due to rounding.

Register of depleted power for electricity sources type “Local electricity sources” with the subsidy right allocated by MH SR (Slovak Ministry of Economy) according to Act no. 309/2009 Coll. in total for the years 2022 and 2023 (in accordance with the Notices of the Ministry of Economy of the Slovak Republic)

Power distribution system
(PDS)
Allocated power
(MW)
Depleted power (MW) Available power
(MW)
ZSD 200.0 129.8 70.2
SSD 209.0 101.4 107.6
VSD 110.0 93.2 16.8
PDS other like RDS
(Regional Distribution System) 2022
20.0 20*) 0*)

*) In terms of Slovak Ministry of Economy information (link)