2,600.0 MW | |
747.0 MW | |
- |
1,000.0 MW | |
3.0 MW | |
- |
686.0 MW | |
379.0 MW | |
- |
600.0 MW | |
152.0 MW | |
- |
314.0 MW | |
213.0 MW | |
- |
923.7 MW | |
672.0 MW | |
251.7 MW |
15.8 MW | |
1.1 MW | |
14.7 MW |
433.3 MW | |
343.6 MW | |
89.7 MW |
260.7 MW | |
149.8 MW | |
110.9 MW |
213.9 MW | |
177.5 MW | |
36.4 MW |
1,676.3 MW | |
75.0 MW | |
- |
984.2 MW | |
1.9 MW | |
- |
252.7 MW | |
35.4 MW | |
- |
339.3 MW | |
2.2 MW | |
- |
100.1 MW | |
35.5 MW | |
- |
Date of last update: 18.11.2024 15:00
Total installed power in global impact point of view | |
Installed power of photovoltaic and wind electricity sources | |
Installed power of other electricity sources |
Total depleted power = depleted power (photovoltaic and wind electricity sources + other electricity sources) above 11 kW
Any difference in totals may be due to rounding.
Register of depleted power for electricity sources type “Local electricity sources” with the subsidy right allocated by MH SR (Slovak Ministry of Economy) according to Act no. 309/2009 Coll. in total for the years 2022 and 2023 (in accordance with the Notices of the Ministry of Economy of the Slovak Republic)
Power distribution system (PDS) |
Allocated power (MW) |
Depleted power (MW) | Available power (MW) |
---|---|---|---|
ZSD | 200.0 | 127.6 | 72.4 |
SSD | 209.0 | 95.8 | 113.2 |
VSD | 110.0 | 93.1 | 16.9 |
PDS other like RDS (Regional Distribution System) 2022 |
20.0 | 20*) | 0*) |
*) In terms of Slovak Ministry of Economy information (link)